Naked basement

The house has been shaking for the past two days as my contractor and some awesome neighbor kids have been demolishing my basement. They’re not completely done with the demolition, but they’ve done most of it. It’s so cool to get rid of that middle wall. It really gives me a better idea of what the space will look like later.

Biggest surprise? We discovered someone had done all the plumbing for a bathroom and then walled (and floored) over it! We’ll be able to put a small bathroom down there and add a ton of value to the house for not-very-much money. Score!

Here are some pics:

This, and the next two pics, are taken from the existing stairs (where my desk use to be). The old well room is that area behind the pellet stove. See the beam in the ceiling on the upper left edge of the picture? There used to be a wall running the length of that beam, separating the basement in half.

.
.

I pivoted about 45 degrees to the left. The opening in the right of this picture is in the left of the picture above. This area used to be Jay’s office and the storeroom. Kind of in the center, in the corner, you can see a tiny black circle on the floor. That’s part of the surprise plumbing. The bathroom would be put in that area. We want that beam in the center of the picture to GO AWAY.

.

And this is one more 45 degree turn to the right. The stairs are to my left (by the flashlight). The drain thingie is in that corner on the right. The bathroom will take up a portion of the right side of this photo. The left side will be an alcove at the back of the main room. We’ll probably build in bookcases and make a reading nook.

.
.

New vantage point — over by the pellet stove looking back towards the stairs, where I was standing in the last photos. These stairs will be closed up, and the new stairs will be at the right edge of the picture.

.

.

.

45 degree turn to the right. Looking into the corner where the reading nook will be. That post is the one going bye bye.

.

.

.

.

A turn further to the right. The bathroom will be on the left side of the photo. The hot water heater was in the old storeroom. It’s going to be moved to the well room, which is out of sight to my immediate right in this picture. We’ll rebuild the storeroom for just that — storage.

.

.

Final pic. I moved to stand in the new bathroom (sort of) to get a picture of the well room. This room is going to stay, but it’s going to be considerably smaller.

Share
This entry was posted in General News and tagged . Bookmark the permalink.

One Response to Naked basement

  1. Woot! It’s well under way, huh? An exciting time!

Leave a Reply

Your email address will not be published. Required fields are marked *